POTOMAC RIVER - WOODROW WILSON BRIDGE
Buffalo Hydraulic has been awarded a contract to design and build two custom hydraulic bridge jacking systems that would allow accurate placement of 72 pre-cast concrete sections. These sections are brought into position on a barge and then lifted by a crane for accurate placement on the new bridge piers.
Precise placement of the pre-cast concrete sections needed more timely accuracy than a crane could provide. Two Buffalo Hydraulic custom-built gas engine power units provided synchronous accuracy, with the ability to allow the operator the opportunity to override for independent control – Allowed the project to be completed safely and ahead of schedule.
From NASA’s Kennedy Space Center to the mountains of the Pacific Northwest and from the Potomac River to Nicosia, Cyprus, and even to the extreme Arctic conditions of Summit Greenland, Buffalo Hydraulic has the experience to make your most complex high-tonnage project a success!
Please contact us today, and we’ll be glad to make the safety and success of your upcoming project our top priority!
After nearly 80 years of service, Buffalo Hydraulic has entered into retirement and is no longer in operation.
To learn more, please click through to our Retirement Page.